Reclaimed water project update for the week of 8/4/21
Thank you for your understanding and patience with our course projects, especially the ladies and their guests who played yesterday. We had quite a bit going on during this event with two road crossings and work on the 6th hole. Thank you again.
Everything we hoped to get completed this past week was completed. So, we are on track!
Here’s what is next:
- Lash Contractors will be building a concrete vault in Calle Los Amigos to install the control valves for water delivery. (This is off-site and will not affect our golf course.)
- 11 and 12 tee areas will be under repair, with sod and irrigation to be removed. This is in preparation for the piping installation, and tee modification per the Todd Eckenrode approved plan.
- The 11th Hole tee box will likely play from a temporary short tee location starting August 10th for two weeks.
- Piping will be installed from 5 to 4 then across the 14th fairway. So, expect some disruption on the 14th hole as it may need to play as a par three on some days.
- Leveling, grading, and clean-up will follow all work after the pipeline installation.
So, lots going on, stay tuned! Thanks again!